My community is a joke ! I wish I had snow removal!
Announcement
Collapse
No announcement yet.
Snow Day!!
Collapse
X
-
This is what Bloomington-Normal was doing at 2am last night to remove the piled up snow that was on the sides of streets. They moved it all into the center of the street and used a gigantic snow blower to put it in dump trucks.
[ame=http://www.youtube.com/watch?v=eBYpoqKtDUA]YouTube - Snow_Removal-2am[/ame]CLICK THE LINK!-----> 2nd Annual Central IL Camaro Meet AND Drag Day---May 21st <-----CLICK THE LINK!
Comment
-
Definitely trying to save money I have heard. Rand Rd. (Rt. 12), Lake Cook Rd., Algonquin Rd. (Rt. 62) all had lanes that abruptly go back and forth between two and then down to one lane in the same direction -- very dangerous -- lots of close calls and people abruptly merging...
Originally posted by cab2g View PostDoes anybody know why it's taking so long for streets to be fully cleared for the most part? There are several major 4 lane roads around me that still have 2-lane sections.
<snip>
Are villages trying to save money and not giving workers overtime? Is there more snow than the plows are capable of moving?01 Camaro SS 'vert: TSI Racing Built 4L60E,ARH Stepped Headers/Catted Y,Noweeds Diverter,SLP FlowPac & Dual-Dual Exhaust,SS Brake Lines,Koni 8241 SAs,Strano Sways,Fays2 Watts Link,UMI CM SFCs welded,Hotchkis Shock Brace,DDM HIDs
02 Camaro RS: Borla Cat-Back,DMH E-Valve,Whisper Lid,SLP CAI & Bilsteins,Auburn LSD,SS Sways,UMI 3pt CM SFCs welded,BMR CM Shock Brace,DDM HIDs
Comment
Comment